Licensed Electrical Contractor · ECRA/ESA #7013002Commercial · Industrial · Institutional

Fire alarm installation

Fire-alarm electrical installation coordinated before ceilings and walls close.

We provide pathways, cabling, field-device installation, sprinkler supervisory wiring and interface work as defined by the project documents and designated fire-alarm provider.

Life-safety wiring needs exact scope and exact coordination.

Fire alarm work touches mechanical equipment, sprinkler systems, elevators, access-controlled doors, smoke control, electrical shutdowns and monitoring. The installation must match the approved design and the assigned responsibilities.

UltraTech reviews device locations, pathway requirements and interfaces early so rough-in stays ahead of drywall and ceiling work.

Pathways & rough-in

Conduit, boxes, sleeves, cable supports and firestopping for fire-alarm circuits.

Field-device cabling

Initiating, notification, signaling and control wiring based on approved documentation.

Sprinkler connections

Flow switches, tamper switches, supervisory points and associated pathways.

Mechanical interfaces

Fan shutdowns, dampers, smoke control and equipment relay wiring as specified.

Door release interfaces

Maglock release, hold-open devices and access-control coordination.

Testing support

Point identification, continuity checks, deficiency correction and support during verification.

A clear line between installation, verification and authority.

We define which party supplies devices, programming, verification, monitoring and final acceptance. That keeps electrical installation responsibilities clear and prevents late surprises.

  • Review of fire-alarm drawings, risers, sequences and specifications
  • Coordination with sprinkler, mechanical, elevator, security and electrical scopes
  • Cable and device identification for testing
  • Support during system verification and deficiency correction
  • Changes documented before extra work proceeds

Questions

Details that help define the scope.

Verification and final acceptance must follow the project requirements and be completed by the designated qualified fire-alarm organization. We support the installation, testing and deficiency process within our contracted scope.

Yes, when included in the project scope. We confirm the number of points, device contacts, cable route and panel/interface requirements before rough-in.

Yes. We review the fire-alarm sequence, relay location, power source and responsibility for each interface with the relevant trades and system provider.

Let’s review the scope before the site gets ahead of the drawings.

Send the project documents or current site condition and we will identify the next steps.

Discuss this service
Call Email Quote